![]() ![]() ![]() It will contribute to the social and economic development of the East Zone of the Valley of Mexico, increasing the capacity to regulate water and preventing floods. It will also prevent urban sprawl and create green spaces through the new Metropolitan Forest, the recovery of an ecological zone and the protection of vulnerable species. Once it begins operating, it will create approximately 450,000 jobs, making it the largest job creator in Latin America. This project will improve the quality of life of the inhabitants of the center of the country and create 160,000 jobs (both direct and indirect) during construction to date, over 40,000 direct and indirect jobs have been created. This will be the world’s gateway to Mexico, the projection of the grandeur and splendor of our country”. Mexicans should feel very proud of what we are building. ![]() These aspects are being coordinated by the Mexico City Airport Group and the Secretariat of Communications and Transportation.Īt the end of the supervision the president declared: ”I feel very proud and encouraged by the progress. He also supervised progress in the water project with the National Water Commission to prevent flooding in the airport area. ![]() President oversaw the progress of the architectural project of the Terminal Building and the Control Tower with the tender bid winners: Foster & Partners and Free, Arquitecto Maestro, responsible for executive projects for the Land Side as well as the construction of runways 2 and 3. On completion, it will have two Terminal Buildings and six runways to serve 125 million passengers a year. President Enrique Peña Nieto visited the construction site of the New Mexico City International Airport, in the municipality of Texcoco in the State of Mexico, to monitor its progress, accompanied by architects Norman Foster and Fernando Romero, the project designers, Secretary of Communications and Transport Gerardo Ruiz Esparza, and director general of the Mexico City Airport Group Federico Patiño Márquez.Īt the meeting, it was explained that the 1st phase (2020-2030) will include the Terminal 1 Building and three simultaneously operating runways to serve approximately 68 million passengers a year. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |